Flagler County, FL
Home MenuHURRICANE MILTON UPDATES
CALL CENTER 386-313-4200 8am - 5pm
LAST UPDATED 2:00 PM – WEDNESDAY, OCTOBER 16, 2024
**IMPORTANT NOTICES***
Residents are asked to report any power outages to FPL directly at FPL.com.
- Avoid any downed power lines and flooded or debris-laden areas that may be hiding downed lines.
For Sandbag Use & Disposal Click HERE
DEBRIS CLEAN-UP
The County and each City/Town have separate services/processes for storm-related debris clean-up.
- For those in the unincorporated areas (not directly in a City or Town) storm-related debris pick-up will begin Monday, October 21 and may take weeks.
- For those that live in a City or Town, please check with your municipality directly.
Please remember to separate regular household garbage from storm related debris.
Please avoid blocking ditches and swales to prevent flooding and support stormwater drainage. When placing curbside, do not block driveways, roadways, mailboxes, or utility poles.
PUBLIC SHOWERS & LAUNDRY FACILITIES AVAILABLE
- Hidden Trails Community Center, located at 6108 Mahogany Blvd, Bunnell, FL 32110
UNMET NEEDS & ASSISTANCE
FEMA ASSISTANCE: May be available to you, if you have uninsured or underinsured losses from the storm.
- Register at www.DisasterAssistance.gov or call 800-621-FEMA (800-621-3362)
OPERATION BLUE ROOF: FEMA / Army Corps of Engineers installation of fiber-reinforced sheeting to cover your damaged roof until arrangements can be made for permanent repairs.
- Register at www.blueroof.gov or call 888-ROOF-BLU (888-766-3258)
CRISIS CLEANUP: If you do not have the ability or means to clean-up your residential storm damage, you may be able to get assistance from a variety of volunteer groups.
- Register at CrisisCleanUp.org or call 844-965-1386
OTHER NEEDS: Please contact our call center during normal business hours and we will do our best to link you up with an available resource.
- eoc@FlaglerCounty.gov or 386-313-4200
ROAD CLOSURES
- Walnut Ave: Fig St to Forest Park St
- Cranberry Ave: CR305 to Forest Park St
- Forest Park St: Cranberry to Mahogany Blvd
- Otis Stone: RR to Hardgrove Grade
- Hardgrove Grade: RR to Otis Stone
- N. Old Dixie / Old Brick Rd: CR13 to County Line
- Walter Boardman Ln: High Bridge to Old Dixie
- Durrance Ln / Strickland Rd
- 53 Karas Tr
COUNTY PARK UPDATES
ADDITIONAL INFORMATION
- As new information is received this page will be updated accordingly.
- Follow @FlaglerEOC on Facebook, X, Instagram
- Call Center: 386-313-4200 // 8a-5p daily
Documents
- 2024 12 02 Agenda Item 8c Attachment 02) Final Plat
- 2024 12 02 Agenda Item 8b Attachment 03) Conceptual Plan
- 2024 12 02 Agenda Item 7d Attachment 02) Evaluation Matrix
- 2024 11 04 Agenda Item 9c Attachment 10) ALTA-TOPO
- 2024 11 04 Agenda Item 9c Attachment 10) Cresswind Boundary
- 2024 11 04 Agenda Item 9c Attachment 09) TIA (2022-5-11)
- 2024 11 04 Agenda Item 9c Attachment 08) Environmental Narrative
- 2024 11 04 Agenda Item 9c Attachment 07) Landscape Plans
- 2024 11 04 Agenda Item 9c Attachment 06) Roundabout Drainage Report
- 2024 11 04 Agenda Item 9c Attachment 05) Drainage Report
- 2024 11 04 Agenda Item 9c Attachment 04) Offsite Plans (Part 1)
- 2024 11 04 Agenda Item 9c Attachment 04) Offsite Plans (Part 2)
- 2024 11 04 Agenda Item 9c Attachment 03) Utility P&P-PHASE 1 ONLY
- 2024 11 04 Agenda Item 9c Attachment 03) Cresswind Civil Plans (Part 1)
- 2024 11 04 Agenda Item 9c Attachment 03) Cresswind Civil Plans (Part 2)
- 2024 11 04 Agenda Item 9c Attachment 03) Cresswind Civil Plans (Part 3)
- 2024 11 04 Agenda Item 9c Attachment 03) Cresswind Civil Plans (Part 4)
- 2024 11 04 Agenda Item 9c Attachment 03) Cresswind Civil Plans (Part 5)
- 2024 11 04 Agenda Item 9c Attachment 02) Prelim Plat
- 2024 10 07 Agenda Item 9a Attachment 06) Application and Supporting Documents
- 2024 10 07 Agenda Item 9a Attachment 05) Landscape Plans
- 2024 10 07 Agenda Item 9a Attachment 04) Drainage Report
- 2024 10 07 Agenda Item 9a Attachment 03) Construction Plans
- 2024 10 07 Agenda Item 9a Attachment 02) Radiance Plat Rev 3
- 2024 09 16 Agenda Item 9c Attachment 7c) Public Comment (3 of 3)
- 2024 09 16 Agenda Item 9c Attachment 7b) Public Comment (2 of 3)
- 2024 09 16 Agenda Item 9c Attachment 7a) Public Comment (1 of 3)
- 2024 09 16 Agenda Item 9c Attachment 3) Original Site Plan Sheet C002
- 2024 09 16 Agenda Item 9c Attachment 2) Revised Site Plan Sheet C002
- 2024 08 19 Agenda - Item 9a Attachment 02b) Landscape Plan
- 2024 08 19 Agenda - Item 9a Attachment 02a) PUD Ordinance with Exhibits
- 2024 08 19 Agenda - Item 8b Attachment 02) Final Plat
- 2024 06 17 Agenda - Item 9a Attachment 02 2nd Site Plan (g)
- 2024 06 17 Agenda - Item 9a Attachment 02 1st Site Plan (f)
- 2024 06 17 Agenda - Item 9b Attachment 02 Preliminary Plat Sheet 1 of 2
- 2024 06 17 Agenda - Item 9b Attachment 02 Preliminary Plat Sheet 2 of 2
- 2024 06 17 Agenda - Item 9b Attachment 03 Boundary Survey (f)
- 2024 06 17 Agenda - Item 9b Attachment 03 Alta, Wetlands, and Topographic Survey (g)
- 2024 06 17 Agenda - Item 9b Attachment 08 Civil Plan Set
- 2024 06 17 Agenda - Item 9b Attachment 09 Geotechical Report (April 8, 2022)
- 2024 06 17 Agenda - Item 9b Attachment 10 Stormwater Report (February 28, 2024)
- 2024 06 03 Agenda - Item 9a Attachment 08 Construction Plans (Oversized)
- 2024 06 03 Agenda - Item 9a Attachment 09 Stormwater Calculations (Oversized)
- 2024 02 19 Agenda - Item 8a Attachment 02a Application 3385 Final Plat
- 2024 02 19 Agenda - Item 8a Attachment 02b Application 3385 Boundary Survey
- 2024 02 05 Agenda - Item 9a Attachment 2(1) Preliminary Plat
- 2024 02 05 Agenda - Item 9a Attachment 2(2) Construction Plan Set
- 2024 02 05 Agenda - Item 9a Attachment 2(3) Stormwater Calculations
- 2024 02 05 Agenda - Item 9a Attachment 3 Boundary & Topographic Survey