Flagler County, FL
Home MenuDocuments
- Accessory Structure Permit
- Fence Owner
- Single Family Residence Requirements Owner 2024
- Swimming Pool Requirements Owner 2024
- Pavers, Concrete, Driveways, Sidewalks, Patio and Pads
- Residential Addition Permit Requirements Owner-
- Residential Hardscape Owner
- Screen Enclosure Owner
- Seawall, Dock Owner
- Solar Owner
- Storm Shutters Owner
- Window Owner
- Interior Exterior Renovation Permit Owner
- HVAC CHANGE OUT OWNER
- Generator Owner Builder
- Gas Permit Owner Builder
- ReRoof Owner
- Electrical Permit Owner
- Detached Garage Owner Builder
- Demolition Owner Builder
- Car Port Owner
- Deck Owner Builder
- Residential Hardscape Owner.pdf
- Residential Addition Permit Requirements Owner.pdf
- Plumbing Permit Requirements Owner.pdf
- Irrigation Owner.pdf
Contact
Central Permitting
1769 E. Moody Blvd.
Building 2, Suite 103
Bunnell, FL 32110
386-313-4003
386-313-4103 (Fax)
Email
Hours
Monday through Friday
8 a.m. to 4:30 p.m.
Flagler County utilizes CD-Plus Permitting Software for Online Permits.
Click here to access the portal.
ATTENTION HOMEOWNERS AND CONTRACTORS
Ordinance 2024-06 amending the Land Development Code's Tree Protection and Landscaping requirements is effective for ALL developments and permits, including single-family homes, submitted on or after 9/18/2024.
FLORIDA BUILDING CODE CHANGE
Please be advised that the Florida Building Code EIGHTH (2023) Edition and the 2020 National Electric Code will become effective on December 31, 2023. Complete applications submitted by the close of business at 5pm on December 29th, 2023, will be reviewed and inspected under the current codes.
Permit applications filed on or prior to December 31, 2023, must be issued within 6 months, extensions will not be granted.
Central Permitting
Central Permitting provides the forms required by the various divisions within the Growth Management Department to those with construction projects in Flagler County. It accepts and routes permit applications for land development, and right-of-way use for review by other divisions.
Check the status of a permit HERE.
Growth Management Fee Schedule
Central Permitting Document Center
FAQs
How do I view and schedule inspections for permits I submitted prior to June 6, 2022?
Contractors and owner-builders with permits that were applied for prior to June 6, 2022 will need to schedule inspections through Guest Access, available at the link above. Permits applied for on or after that date will appear in your account when you log in. Click here to read a short guide on how to view permits you applied for prior to June 6th.
I'm trying to create an online account and cannot add myself as contractor. What do I do?
Even if you were previously registered with Flagler County, our system only contains contractor licensing information that was current with the City of Palm Coast on May 19, 2022. If you were not registered with Palm Coast on that date, you will need to contact Ed Rodriguez at erodriguez@flaglercounty.gov with all required information in order to register. Once you are registered, you will be able to create an online account and locate your contractor registration.
How do I register/apply for a permit/revise my application/pay online/manage inspections/change contractors or sub-contractors?
Flagler County has put together a short PDF guide you can access here with some of the most frequently-asked questions. We plan to publish more guidance in the future.
What if I'm having another issue that is not listed?
If you are experiencing another issue not resolved above, please call Central Permitting at 386-313-4003.